
Physical Therapy Assistant Laboratory
For this project, Peter Schwabe, Inc. converted a cramped laboratory into a well-designed Physical Therapy Assistant Laboratory. The lab conversion included a small classroom, changing room, new millwork cabinetry, and new floor-to-ceiling glass windows lining both hallways. The new space requirements also needed to accommodate PT equipment and weights, exercise bikes and 7 beds.